Possible Determination of an Extraordinary Nuclear Occurrence at Three Mile Island Unit 2, April 2, 1979

Background

The following documents is a COMMISSIONER ACTION memo, labeled SECY-79-235 from Harold R. Denton, Director Office of Nuclear Reactor Regulation, dated April 2, 1979.

The purpose of the action report is listed as:

To advise the Commission of some decisions that will need to be made in the immediate future regarding the application of the Price Anderson Act to the Three Mile Island Unit 2 accident.

Continue scrolling for more...

The Three Mile Island Unit 2 (TMI-2) reactor, near Middletown, Pa., partially melted down on March 28, 1979. This was the most serious accident in U.S. commercial nuclear power plant operating history, although its small radioactive releases had no detectable health effects on plant workers or the public. Its aftermath brought about sweeping changes involving emergency response planning, reactor operator training, human factors engineering, radiation protection, and many other areas of nuclear power plant operations. It also caused the NRC to tighten and heighten its regulatory oversight. All of these changes significantly enhanced U.S. reactor safety.

A combination of equipment malfunctions, design-related problems and worker errors led to TMI-2’s partial meltdown and very small off-site releases of radioactivity.

Document Archive

 SECY-79-235, April 2, 1979, Possible Determination of an Extraordinary Nuclear Occurrence at Three Mile Island Unit 2 [17 Pages, 0.7MB]

 

Follow The Black Vault on Social Media:

This post was published on November 22, 2016 10:25 pm

John Greenewald

Recent Posts

TEMPS (Transportable Electromagnetic Pulse Simulator) Final Reports, 1973

The two volumes of the TEMPS (Transportable Electromagnetic Pulse Simulator) Final Report, dated August 1973…

June 8, 2025

FBI Releases Internal Emails on Comey Following FOIA Appeal Win by The Black Vault

This was originally published on  November 7, 2023. The article has been left unchanged, but…

June 6, 2025

Newly Released Navy Emails Reveal UAP Coordination, Five Eyes Briefings, and Forgotten Redactions

In a newly released batch of internal U.S. Navy emails, obtained by The Black Vault…

June 3, 2025

What the U.S. Military Now Says About TTSA’s Anomalous Artifact

The U.S. Army has officially closed out its Cooperative Research and Development Agreement (CRADA) with…

May 29, 2025

Defense Department Emails Confirm 2017 UAP Briefings, Further Clarify Luis Elizondo’s Role in AATIP

Newly released internal emails from the Department of Defense, obtained through a FOIA request filed…

May 28, 2025