{"id":3618,"date":"2016-12-20T22:58:08","date_gmt":"2016-12-20T22:58:08","guid":{"rendered":"http:\/\/www.theblackvault.com\/documentarchive\/?p=3618"},"modified":"2020-06-09T23:13:04","modified_gmt":"2020-06-09T23:13:04","slug":"repair-control-settlement-jefferson-memorial-seawall-2005","status":"publish","type":"post","link":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/","title":{"rendered":"Repair and Control Settlement at Jefferson Memorial Seawall, 2005"},"content":{"rendered":"<h3>Background<\/h3>\n<p>According to <a href=\"http:\/\/www.schnabel-eng.com\/\" target=\"_blank\" rel=\"noopener noreferrer\"><span class=\"TweetAuthor-name Identity-name customisable-highlight\" title=\"Schnabel Engineering\" data-scribe=\"element:name\">Schnabel Engineering<\/span><\/a>:<\/p>\n<p style=\"padding-left: 30px;\"><em><strong>In 2005, settlement and lateral movement of the North Plaza and the Ashlar Seawall prompted the National Park Service (NPS) to close a portion of the Jefferson Memorial due to public safety concerns. Schnabel was commissioned by NPS to analyze the problem and develop a repair strategy. [They] conducted an extended settlement study to determine the cause of the seawall and North Plaza movements and the rate of settlement. The problem was in large part due to the foundation timber piles of the seawall not extending to bedrock.<\/strong><\/em><\/p>\n<p style=\"padding-left: 30px;\"><em><strong>Schnabel conducted a value analysis with NPS to determine the best remedy. The selected option involved demolition and then reconstruction of the seawall on 48-inch-diameter caissons and 18-inch-diameter steel pipe piles. This $13.5 million project was one of the first in Washington, DC to be funded by the American Recovery and Reinvestment Act of 2009. The project received an ASCE 2012 Project of the Year Award from the National Capital Section.<\/strong><\/em><\/p>\n<p>In 2016, I filed a FOIA request to see documentation relating to the project. Below, you will find a breakdown of the records that came in from the National Park Service (NPS).<\/p>\n<h3>Declassified Documents<\/h3>\n<p><img decoding=\"async\" src=\"https:\/\/www.theblackvault.com\/images\/pdf.gif\" \/>\u00a0<a href=\"https:\/\/documents.theblackvault.com\/documents\/NPS\/jefferson\/2016-00928.pdf\">FOIA Response, dated November 10, 2016<\/a> [3 Pages, 0.4MB]<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.theblackvault.com\/images\/pdf.gif\" \/>\u00a0<a href=\"https:\/\/documents.theblackvault.com\/documents\/NPS\/jefferson\/JEFM_808_106595_0440pg.pdf\">JEFM_808_106595_0440pg.pdf &#8211; <strong>CONTRACT #1443C2000040800 REPAIR AND CONTROL SETTLEMENT AT JEFFERSON MEMORIAL SEAWALL, NORTH PLAZA AND TRANSITION AREAS &#8211; PMIS NO 128232 &#8211; SUPPLEMENTAL DOCUMENTS<\/strong><\/a>\u00a0[441 Pages, 25.5MB]<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.theblackvault.com\/images\/pdf.gif\" \/>\u00a0<a href=\"https:\/\/documents.theblackvault.com\/documents\/NPS\/jefferson\/JEFM_808_117504_0001_of_0116.pdf\">JEFM_808_117504_0001_of_0116.pdf &#8211; <strong>Repair and Control Settlement at Thomas Jefferson Memorial Seawall, North Plaza, and Transition Areas NAMA 128232<\/strong><\/a>\u00a0[116 Pages, 13.7MB]<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.theblackvault.com\/images\/pdf.gif\" \/>\u00a0<a href=\"https:\/\/documents.theblackvault.com\/documents\/NPS\/jefferson\/JEFM_808_128922_A.pdf\">JEFM_808_128922_A.pdf &#8211;<strong> PROJECT SITE<\/strong><\/a>\u00a0[3 Pages, 10.4MB]<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.theblackvault.com\/images\/pdf.gif\" \/>\u00a0<a href=\"https:\/\/documents.theblackvault.com\/documents\/NPS\/jefferson\/JEFM_808_25005_A_Redacted.pdf\">JEFM_808_25005_A_Redacted.pdf &#8211; \u00a0<strong>AS-BUILT PROJECT DRAWINGS ON FIELD SET BY CLARK CONSTRUCTION RECORD BASED (SEPTEMBER 2011)<\/strong><\/a>\u00a0[58 Pages, 74.5MB]<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.theblackvault.com\/images\/pdf.gif\" \/>\u00a0<a href=\"https:\/\/documents.theblackvault.com\/documents\/NPS\/jefferson\/JEFM_808_25005_Redacted.pdf\">JEFM_808_25005_Redacted.pdf &#8211; \u00a0<strong>EMERGENCY REPAIRS FOR SETTLEMENT AT JEFFERSON MEMORIAL SEAWALL\u00a0<\/strong><\/a>[54 Pages, 17.8MB]<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.theblackvault.com\/images\/pdf.gif\" \/>\u00a0<a href=\"https:\/\/documents.theblackvault.com\/documents\/NPS\/jefferson\/JEFM_808_C5_1.pdf\">JEFM_808_C5_1.pdf &#8211; Investigation of Settlement and Upheaval at the Jefferson Memorial National Mall &amp; Memorial Parks, January 30, 2008<\/a>\u00a0[315 Pages, 33.9MB]<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.theblackvault.com\/images\/pdf.gif\" \/>\u00a0<a href=\"https:\/\/documents.theblackvault.com\/documents\/NPS\/jefferson\/JEFM_808_C5_2.pdf\">JEFM_808_C5_2.pdf &#8211; Investigation of Settlement and Upheaval at the Jefferson Memorial National Mall &amp; Memorial Parks, January 30, 2008, Class C Estimate &#8211; Final<\/a>\u00a0[13 Pages, 0.3MB]<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.theblackvault.com\/images\/pdf.gif\" \/>\u00a0<a href=\"https:\/\/documents.theblackvault.com\/documents\/NPS\/jefferson\/NAMA_802_25002_A_0001_of_0050.pdf\">NAMA_802_25002_A_0001_of_0050.pdf &#8211; \u00a0<strong>EMERGENCY REPAIRS FOR SETTLEMENT AT JEFFERSON MEMORIAL SEAWALL\u00a0<\/strong><\/a>[50 Pages, 8.6MB]<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.theblackvault.com\/images\/pdf.gif\" \/>\u00a0<a href=\"https:\/\/documents.theblackvault.com\/documents\/NPS\/jefferson\/NAMA_802_D69_0001_of_0072_F808C6.pdf\">NAMA_802_D69_0001_of_0072_F808C6.pdf &#8211; <strong>CONTRACT #1443C2000040800 REPAIR AND CONTROL SETTLEMENT AT JEFFERSON MEMORIAL SEAWALL, NORTH PLAZA AND TRANSITION AREAS &#8211; PMIS NO 128232 &#8211; FINAL PREDESIGN DOCUMENTS<\/strong><\/a>\u00a0[72 Pages, 13.4MB]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Background According to Schnabel Engineering: In 2005, settlement and lateral movement of the North Plaza and the Ashlar Seawall prompted the National Park Service (NPS) to close a portion of the Jefferson Memorial due to public safety concerns. Schnabel was commissioned by NPS to analyze the problem and develop a repair strategy. [They] conducted an<\/p>\n","protected":false},"author":1,"featured_media":11179,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"episode_type":"","audio_file":"","transcript_file":"","podmotor_file_id":"","podmotor_episode_id":"","cover_image":"","cover_image_id":"","duration":"","filesize":"","filesize_raw":"","date_recorded":"","explicit":"","block":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[2],"tags":[949],"class_list":["post-3618","post","type-post","status-publish","format-standard","has-post-thumbnail","category-government","tag-jefferson-memorial"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Background According to Schnabel Engineering: In 2005, settlement and lateral movement of the North Plaza and the Ashlar Seawall prompted the National Park Service (NPS) to close a portion of the Jefferson Memorial due to public safety concerns. Schnabel was commissioned by NPS to analyze the problem and develop a repair strategy. [They] conducted an\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"John Greenewald\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"The Black Vault - Discover the Truth\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Repair and Control Settlement at Jefferson Memorial Seawall, 2005 - The Black Vault\" \/>\n\t\t<meta property=\"og:description\" content=\"Background According to Schnabel Engineering: In 2005, settlement and lateral movement of the North Plaza and the Ashlar Seawall prompted the National Park Service (NPS) to close a portion of the Jefferson Memorial due to public safety concerns. Schnabel was commissioned by NPS to analyze the problem and develop a repair strategy. [They] conducted an\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.theblackvault.com\/documentarchive\/wp-content\/uploads\/2016\/12\/6-9-2020-4-12-08-PM.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.theblackvault.com\/documentarchive\/wp-content\/uploads\/2016\/12\/6-9-2020-4-12-08-PM.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1505\" \/>\n\t\t<meta property=\"og:image:height\" content=\"744\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2016-12-20T22:58:08+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2020-06-09T23:13:04+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Repair and Control Settlement at Jefferson Memorial Seawall, 2005 - The Black Vault\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Background According to Schnabel Engineering: In 2005, settlement and lateral movement of the North Plaza and the Ashlar Seawall prompted the National Park Service (NPS) to close a portion of the Jefferson Memorial due to public safety concerns. Schnabel was commissioned by NPS to analyze the problem and develop a repair strategy. [They] conducted an\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.theblackvault.com\/documentarchive\/wp-content\/uploads\/2016\/12\/6-9-2020-4-12-08-PM.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/repair-control-settlement-jefferson-memorial-seawall-2005\\\/#blogposting\",\"name\":\"Repair and Control Settlement at Jefferson Memorial Seawall, 2005 - The Black Vault\",\"headline\":\"Repair and Control Settlement at Jefferson Memorial Seawall, 2005\",\"author\":{\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/author\\\/administrator\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/6-9-2020-4-12-08-PM.jpg\",\"width\":1505,\"height\":744},\"datePublished\":\"2016-12-20T22:58:08+00:00\",\"dateModified\":\"2020-06-09T23:13:04+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/repair-control-settlement-jefferson-memorial-seawall-2005\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/repair-control-settlement-jefferson-memorial-seawall-2005\\\/#webpage\"},\"articleSection\":\"Government, jefferson memorial\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/repair-control-settlement-jefferson-memorial-seawall-2005\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/category\\\/government\\\/#listItem\",\"name\":\"Government\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/category\\\/government\\\/#listItem\",\"position\":2,\"name\":\"Government\",\"item\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/category\\\/government\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/repair-control-settlement-jefferson-memorial-seawall-2005\\\/#listItem\",\"name\":\"Repair and Control Settlement at Jefferson Memorial Seawall, 2005\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/repair-control-settlement-jefferson-memorial-seawall-2005\\\/#listItem\",\"position\":3,\"name\":\"Repair and Control Settlement at Jefferson Memorial Seawall, 2005\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/category\\\/government\\\/#listItem\",\"name\":\"Government\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/#organization\",\"name\":\"The Black Vault\",\"description\":\"Discover the Truth\",\"url\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/author\\\/administrator\\\/#author\",\"url\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/author\\\/administrator\\\/\",\"name\":\"John Greenewald\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/repair-control-settlement-jefferson-memorial-seawall-2005\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/49e167a0fd63564e8d54fa9b2ee5f1c9c4e6808ec394e8da6d328f5733c76582?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"John Greenewald\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/repair-control-settlement-jefferson-memorial-seawall-2005\\\/#webpage\",\"url\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/repair-control-settlement-jefferson-memorial-seawall-2005\\\/\",\"name\":\"Repair and Control Settlement at Jefferson Memorial Seawall, 2005 - The Black Vault\",\"description\":\"Background According to Schnabel Engineering: In 2005, settlement and lateral movement of the North Plaza and the Ashlar Seawall prompted the National Park Service (NPS) to close a portion of the Jefferson Memorial due to public safety concerns. Schnabel was commissioned by NPS to analyze the problem and develop a repair strategy. [They] conducted an\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/repair-control-settlement-jefferson-memorial-seawall-2005\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/author\\\/administrator\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/author\\\/administrator\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/6-9-2020-4-12-08-PM.jpg\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/repair-control-settlement-jefferson-memorial-seawall-2005\\\/#mainImage\",\"width\":1505,\"height\":744},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/repair-control-settlement-jefferson-memorial-seawall-2005\\\/#mainImage\"},\"datePublished\":\"2016-12-20T22:58:08+00:00\",\"dateModified\":\"2020-06-09T23:13:04+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/#website\",\"url\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/\",\"name\":\"The Black Vault\",\"description\":\"Discover the Truth\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.theblackvault.com\\\/documentarchive\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Repair and Control Settlement at Jefferson Memorial Seawall, 2005 - The Black Vault","description":"Background According to Schnabel Engineering: In 2005, settlement and lateral movement of the North Plaza and the Ashlar Seawall prompted the National Park Service (NPS) to close a portion of the Jefferson Memorial due to public safety concerns. Schnabel was commissioned by NPS to analyze the problem and develop a repair strategy. [They] conducted an","canonical_url":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/#blogposting","name":"Repair and Control Settlement at Jefferson Memorial Seawall, 2005 - The Black Vault","headline":"Repair and Control Settlement at Jefferson Memorial Seawall, 2005","author":{"@id":"https:\/\/www.theblackvault.com\/documentarchive\/author\/administrator\/#author"},"publisher":{"@id":"https:\/\/www.theblackvault.com\/documentarchive\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.theblackvault.com\/documentarchive\/wp-content\/uploads\/2016\/12\/6-9-2020-4-12-08-PM.jpg","width":1505,"height":744},"datePublished":"2016-12-20T22:58:08+00:00","dateModified":"2020-06-09T23:13:04+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/#webpage"},"isPartOf":{"@id":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/#webpage"},"articleSection":"Government, jefferson memorial"},{"@type":"BreadcrumbList","@id":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.theblackvault.com\/documentarchive#listItem","position":1,"name":"Home","item":"https:\/\/www.theblackvault.com\/documentarchive","nextItem":{"@type":"ListItem","@id":"https:\/\/www.theblackvault.com\/documentarchive\/category\/government\/#listItem","name":"Government"}},{"@type":"ListItem","@id":"https:\/\/www.theblackvault.com\/documentarchive\/category\/government\/#listItem","position":2,"name":"Government","item":"https:\/\/www.theblackvault.com\/documentarchive\/category\/government\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/#listItem","name":"Repair and Control Settlement at Jefferson Memorial Seawall, 2005"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.theblackvault.com\/documentarchive#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/#listItem","position":3,"name":"Repair and Control Settlement at Jefferson Memorial Seawall, 2005","previousItem":{"@type":"ListItem","@id":"https:\/\/www.theblackvault.com\/documentarchive\/category\/government\/#listItem","name":"Government"}}]},{"@type":"Organization","@id":"https:\/\/www.theblackvault.com\/documentarchive\/#organization","name":"The Black Vault","description":"Discover the Truth","url":"https:\/\/www.theblackvault.com\/documentarchive\/"},{"@type":"Person","@id":"https:\/\/www.theblackvault.com\/documentarchive\/author\/administrator\/#author","url":"https:\/\/www.theblackvault.com\/documentarchive\/author\/administrator\/","name":"John Greenewald","image":{"@type":"ImageObject","@id":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/49e167a0fd63564e8d54fa9b2ee5f1c9c4e6808ec394e8da6d328f5733c76582?s=96&d=mm&r=g","width":96,"height":96,"caption":"John Greenewald"}},{"@type":"WebPage","@id":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/#webpage","url":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/","name":"Repair and Control Settlement at Jefferson Memorial Seawall, 2005 - The Black Vault","description":"Background According to Schnabel Engineering: In 2005, settlement and lateral movement of the North Plaza and the Ashlar Seawall prompted the National Park Service (NPS) to close a portion of the Jefferson Memorial due to public safety concerns. Schnabel was commissioned by NPS to analyze the problem and develop a repair strategy. [They] conducted an","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.theblackvault.com\/documentarchive\/#website"},"breadcrumb":{"@id":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/#breadcrumblist"},"author":{"@id":"https:\/\/www.theblackvault.com\/documentarchive\/author\/administrator\/#author"},"creator":{"@id":"https:\/\/www.theblackvault.com\/documentarchive\/author\/administrator\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.theblackvault.com\/documentarchive\/wp-content\/uploads\/2016\/12\/6-9-2020-4-12-08-PM.jpg","@id":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/#mainImage","width":1505,"height":744},"primaryImageOfPage":{"@id":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/#mainImage"},"datePublished":"2016-12-20T22:58:08+00:00","dateModified":"2020-06-09T23:13:04+00:00"},{"@type":"WebSite","@id":"https:\/\/www.theblackvault.com\/documentarchive\/#website","url":"https:\/\/www.theblackvault.com\/documentarchive\/","name":"The Black Vault","description":"Discover the Truth","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.theblackvault.com\/documentarchive\/#organization"}}]},"og:locale":"en_US","og:site_name":"The Black Vault - Discover the Truth","og:type":"article","og:title":"Repair and Control Settlement at Jefferson Memorial Seawall, 2005 - The Black Vault","og:description":"Background According to Schnabel Engineering: In 2005, settlement and lateral movement of the North Plaza and the Ashlar Seawall prompted the National Park Service (NPS) to close a portion of the Jefferson Memorial due to public safety concerns. Schnabel was commissioned by NPS to analyze the problem and develop a repair strategy. [They] conducted an","og:url":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/","og:image":"https:\/\/www.theblackvault.com\/documentarchive\/wp-content\/uploads\/2016\/12\/6-9-2020-4-12-08-PM.jpg","og:image:secure_url":"https:\/\/www.theblackvault.com\/documentarchive\/wp-content\/uploads\/2016\/12\/6-9-2020-4-12-08-PM.jpg","og:image:width":1505,"og:image:height":744,"article:published_time":"2016-12-20T22:58:08+00:00","article:modified_time":"2020-06-09T23:13:04+00:00","twitter:card":"summary_large_image","twitter:title":"Repair and Control Settlement at Jefferson Memorial Seawall, 2005 - The Black Vault","twitter:description":"Background According to Schnabel Engineering: In 2005, settlement and lateral movement of the North Plaza and the Ashlar Seawall prompted the National Park Service (NPS) to close a portion of the Jefferson Memorial due to public safety concerns. Schnabel was commissioned by NPS to analyze the problem and develop a repair strategy. [They] conducted an","twitter:image":"https:\/\/www.theblackvault.com\/documentarchive\/wp-content\/uploads\/2016\/12\/6-9-2020-4-12-08-PM.jpg"},"aioseo_meta_data":{"post_id":"3618","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2023-04-05 19:54:30","updated":"2025-06-18 22:24:11","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.theblackvault.com\/documentarchive\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.theblackvault.com\/documentarchive\/category\/government\/\" title=\"Government\">Government<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tRepair and Control Settlement at Jefferson Memorial Seawall, 2005\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.theblackvault.com\/documentarchive"},{"label":"Government","link":"https:\/\/www.theblackvault.com\/documentarchive\/category\/government\/"},{"label":"Repair and Control Settlement at Jefferson Memorial Seawall, 2005","link":"https:\/\/www.theblackvault.com\/documentarchive\/repair-control-settlement-jefferson-memorial-seawall-2005\/"}],"jetpack_featured_media_url":"https:\/\/www.theblackvault.com\/documentarchive\/wp-content\/uploads\/2016\/12\/6-9-2020-4-12-08-PM.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.theblackvault.com\/documentarchive\/wp-json\/wp\/v2\/posts\/3618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.theblackvault.com\/documentarchive\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.theblackvault.com\/documentarchive\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.theblackvault.com\/documentarchive\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.theblackvault.com\/documentarchive\/wp-json\/wp\/v2\/comments?post=3618"}],"version-history":[{"count":0,"href":"https:\/\/www.theblackvault.com\/documentarchive\/wp-json\/wp\/v2\/posts\/3618\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.theblackvault.com\/documentarchive\/wp-json\/wp\/v2\/media\/11179"}],"wp:attachment":[{"href":"https:\/\/www.theblackvault.com\/documentarchive\/wp-json\/wp\/v2\/media?parent=3618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.theblackvault.com\/documentarchive\/wp-json\/wp\/v2\/categories?post=3618"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.theblackvault.com\/documentarchive\/wp-json\/wp\/v2\/tags?post=3618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}